Skip to content
ScaffoldingAccess scaffolding

Better jobs, not more jobs: a shift from unpaid quotes on small, low-margin hires to pre-qualified full-house, trade and complex-access projects in Leicester and Leicestershire

Keystone Access Solutions · Leicester, East Midlands · 60 days

Keystone Access Solutions logo
£56.5k
revenue generated
12.6x
return on ad spend
14
jobs won
90
enquiries

The challenge

  • Wasted quotes: a large share of free site visits and written quotes went to people comparing five prices with no confirmed budget, so the owner spent unpaid hours travelling, measuring and pricing for jobs that never started
  • Low-value work crowding the diary: single-elevation hires, one-day bookings and short-term access jobs filled the phone but barely covered crew, transport and erection time
  • Cancellations and postponements: jobs booked then cancelled or pushed back because the person enquiring was not the decision-maker, or the start date was never firm
  • Unconfirmed decision-makers: quotes sent to tenants, site contacts or one half of a couple, then reopened or lost when the real payer got involved
  • Wrong areas: enquiries outside the preferred parts of Leicester and Leicestershire meant long travel and thin margins
  • Price-led local market: a crowded field of scaffolders where the cheapest quote often won, with little visible proof of safety, quality or reliability to justify a higher price
  • Slow replies: the team is on the scaffold from first light, so enquiries went unanswered and quotes went out days late, and the larger jobs went to faster competitors

Our approach

FoundationsWeeks 1-2

  • Google Business Profile with Leicester and Leicestershire service areas, services split by domestic, trade and commercial access, and photos of finished scaffolds
  • Dedicated landing pages for house scaffolding, scaffolding for roofers and builders, and commercial or heritage access, each with project gallery, safety process, accreditations (if held) and a qualifying quote form
  • Quote form questions that pre-qualify: job type, property type and storeys, elevations, postcode, start date, hire length, budget range, who is paying and who signs off, with photo or address upload
  • Review-collection process: request a review within 48 hours of every dismantle, prioritising larger projects and trade clients
  • Trust assets: scaffold inspection and handover process, insurance and compliance details, and a plain-English pricing guide that sets price expectations before the first call

Lead generationWeeks 2-8

  • Google Ads on high-intent searches (scaffolding hire Leicester, house scaffolding Oadby, scaffolders for roofers Loughborough) with negative keywords for DIY, cheap, tower-hire and 'scaffold boards for sale' terms, plus postcode and radius targeting
  • Local SEO and Google Business Profile posts focused on larger projects, to build trust ahead of paid spend
  • Facebook and Instagram ads with time-lapse erection videos and finished-job photos, targeted by postcode at homeowners with planned re-roofs, extensions and renovations
  • B2B outreach to roofers, builders, extension and loft-conversion firms, architects, letting agents and developers, offering priority scheduling and trade rates for repeat work
  • Referral partnerships with roofing, rendering and window companies who regularly need scaffold access
  • Seasonal campaigns for the spring and summer building season and pre-winter roof repairs, where timing matters

Qualifying enquiries

  • Automated form scoring on budget, start date, decision-maker, job type and postcode puts leads into A, B or C before a human spends any time
  • A-leads get a same-day call from the owner or estimator; C-leads get a polite text with a minimum-charge option or a signposted alternative
  • Photo, address or drawing request before booking any site visit, to avoid wasted trips
  • Survey only booked once budget range, start window and decision-maker are confirmed; this is the rule that protects unpaid quoting time

Follow-up sequence

  1. Instant response · Within 60 seconds

    Automatic text and email confirming receipt and asking for the address, photos, start date and hire length, handled even while the team is on the scaffold

  2. Qualifying call · Same day for A-leads

    Call to confirm scope, access, budget range, start date, hire length and who is paying and signing off

  3. Survey · Within 3 days, only after qualification

    Site visit or photo and map-based survey, with a measured plan and any access, highway-licence or ground issues flagged

  4. Quote · Within 24 hours of survey

    Itemised written quote covering erection, hire period, extensions, alterations and dismantle, with a clear safety and inspection process, photos of similar jobs and the decision-maker copied in

  5. Follow-up 1 · Day 2

    Text confirming quote received and offering a call to walk through it

  6. Follow-up 2 · Day 5

    Relevant review or finished-job photos from a similar property or trade client

  7. Follow-up 3 · Day 10

    Reserved erection slot with a hold deadline, so the start date is protected for a confirmed booking

  8. Follow-up 4 · Day 21

    Final check-in with the next available erection date

  9. Booking confirmation · On acceptance

    Written confirmation of start date, hire period, access requirements and payment terms, with a reminder 3 days before erection to cut cancellations

  10. Trade account nurture · Monthly

    Availability update and short project round-up to roofers and builders, so the firm is first call for the next job

  11. Post-job · 48 hours after dismantle

    Request review and referral, and ask for details of the next job in the pipeline

Pipeline stages

New → Qualified A/B/C → Survey booked → Quoted → Slot held → Won → Lost → Redirected

Key takeaways

  • Better jobs, not more jobs: filtering at the enquiry stage matters more than increasing lead volume
  • Quoting time is unpaid: pre-qualifying budget, timeline and decision-maker removes roughly half the surveys needed to win the same number of jobs
  • A lower qualified rate is fine if the jobs that remain are worth around six times as much
  • Confirming the decision-maker before the survey cuts reopened quotes and cancellations
  • Speed wins jobs: instant replies mean enquiries are answered even while the team is on the scaffold
  • Trust justifies price: visible safety process, reviews and finished projects make it possible to win on more than the cheapest quote
  • Follow-up closes the sale: holding an erection slot with a deadline turns 'I'll get back to you' into a booking
  • Builder and roofer accounts turn one-off hires into repeat work and steady the diary

More case studies

  • Coastline Interior Contracts logo
    Plastering· Blackpool, Lancashire

    Coastline Interior Contracts

    No word-of-mouth network: no reviews, past-client referrals or builder relationships

    £72k
    revenue generated
    20.6x
    return on ad spend
  • Elephant Roofing & Slating logo
    Roofing· Coventry, West Midlands

    Elephant Roofing & Slating

    Discretionary, high-ticket work: full re-roofs and slate or tile restorations are often delayed when households feel squeezed, so demand swings with the economy

    £125k
    revenue generated
    20.8x
    return on ad spend
  • Heritage Floor & Tile logo
    Floor laying· Winchester, Hampshire

    Heritage Floor & Tile

    Discretionary, high-ticket work: new floors, bathroom and kitchen tiling and natural stone are the first things households delay when money is tight, so demand swings with the economy

    £68k
    revenue generated
    13.6x
    return on ad spend

Want results like these?

Tell us a bit about your business and we'll be in touch within 4 hours to see if we're a good fit.